Adobe blames 'maintenance failure' for 27-hour outage

Unidentified 'root cause' borks the system during work on database


Adobe has blamed a maintenance failure for the 27-hour outage in its Creative Cloud suite that left video and photo editors unable to log into online services.

“The failure happened during database maintenance activity and affected services that require users to log in with an Adobe ID,” Adobe said in a blog post apologising for the down-time.

“We understand that the time it took to restore service has been frustrating, but we wanted to be as thorough as possible. We have identified the root cause of this failure and are putting standards in place to prevent this from happening again.”

The Reg has asked Adobe what that “root cause” might be, but the company hadn’t gotten back to us at the time of publication.

That leaves the software firm's own maintenance as the top culprit, a rather dim prospect for users worried about whether this sort of thing might happen again. If Twitter is any indication, graphics pros are not feeling very forgiving, even now that the service is back online.

Other Twitter users said they weren’t happy with the “dumb responses” from Adobe on the issue or that the outage pointed out the problem with having so much creative software centralised on a single service.

Meanwhile users of older versions of the software – who still have hard copies of older versions of the software, before it flew into the cloud, were busily rubbing their colleagues’ faces in it and vowing not to upgrade.

Adobe’s new business model relies on getting people to upgrade to its latest version of Creative Suite, which it has turned from an expensive piece of software into a cloud-based subscription service. Users can no longer get up-to-date box versions of its hugely popular graphics apps bundle, which includes Photoshop, Dreamweaver, Premiere and InDesign to name a few.

So far though, the move has not gone as smoothly as the firm might have liked. In the early days of the move, the storage part of the cloud service forgot to sync users’ files for a whole fortnight, while late last year, the firm was hit with a security breach that leaked the login details for as many as 38 million customers. ®


Other stories you might like

  • 'Prolific' NetWalker extortionist pleads guilty to ransomware charges
    Canadian stole $21.5m from dozens of companies worldwide

    A former Canadian government employee has pleaded guilty in a US court to several charges related to his involvement with the NetWalker ransomware gang.

    On Tuesday, 34-year-old Sebastien Vachon-Desjardins admitted he conspired to commit computer and wire fraud, intentionally damaged a protected computer, and transmitted a demand in relation to damaging a protected computer. 

    He will also forfeit $21.5 million and 21 laptops, mobile phones, gaming consoles, and other devices, according to his plea agreement [PDF], which described Vachon-Desjardins as "one of the most prolific NetWalker Ransomware affiliates" responsible for extorting said millions of dollars from dozens of companies worldwide.

    Continue reading
  • City-killing asteroid won't hit Earth in 2052 after all
    ESA ruins our day with some bad news

    An asteroid predicted to hit Earth in 2052 has, for now, been removed from the European Space Agency's list of rocks to be worried about.

    Asteroid 2021 QM1 was described by ESA as "the riskiest asteroid known to humankind," at least among asteroids discovered in the past year. QM1 was spotted in August 2021 by Arizona-based Mount Lemmon observatory, and additional observations only made its path appear more threatening.

    "We could see its future paths around the Sun, and in 2052 it could come dangerously close to Earth. The more the asteroid was observed, the greater that risk became," said ESA Head of Planetary Defense Richard Moissl. 

    Continue reading
  • Why Wi-Fi 6 and 6E will connect factories of the future
    Tech body pushes reliability, cost savings of next-gen wireless comms for IIoT – not a typo

    Wi-Fi 6 and 6E are being promoted as technologies for enabling industrial automation and the Industrial Internet of Things (IIoT) thanks to features that provide more reliable communications and reduced costs compared with wired network alternatives, at least according to the Wireless Broadband Alliance (WBA).

    The WBA’s Wi-Fi 6/6E for IIoT working group, led by Cisco, Deutsche Telekom, and Intel, has pulled together ideas on the future of networked devices in factories and written it all up in a “Wi-Fi 6/6E for Industrial IoT: Enabling Wi-Fi Determinism in an IoT World” manifesto.

    The detailed whitepaper makes the case that wireless communications has become the preferred way to network sensors as part of IIoT deployments because it's faster and cheaper than fiber or copper infrastructure. The alliance is a collection of technology companies and service providers that work together on developing standards, coming up with certifications and guidelines, advocating for stuff that they want, and so on.

    Continue reading
  • Intel demos multi-wavelength laser array integrated on silicon wafer
    Next stop – on-chip optical interconnects? Plus it's built with 300mm tech, meaning potential volume production

    Intel is claiming a significant advancement in its photonics research with an eight-wavelength laser array that is integrated on a silicon wafer, marking another step on the road to on-chip optical interconnects.

    This development from Intel Labs will enable the production of an optical source with the required performance for future high-volume applications, the chip giant claimed. These include co-packaged optics, where the optical components are combined in the same chip package as other components such as network switch silicon, and optical interconnects between processors.

    According to Intel Labs, its demonstration laser array was built on the company's well-established 300mm wafer manufacturing technology which is already used to make optical transceivers, paving the way for high-volume manufacturing in future. The eight-wavelength array uses distributed feedback (DFB) laser diodes, which apparently refers to the use of a periodically structured element or diffraction grating inside the laser to generate a single frequency output.

    Continue reading
  • Ex-Uber security chief accused of hushing database breach must face fraud charges
    Company execs and their lawyers are paying close attention to this one

    A US judge yesterday threw out an attempt to dismiss wire fraud charges against a former Uber employee accused of trying to cover up a computer crime.

    Former Uber security chief Joseph Sullivan is set to face criminal charges after US District Judge William Orrick yesterday [PDF] rejected his claim that prosecutors did not "adequately" allege that the goal of the claimed misrepresentation of the security breach was to get Uber's drivers to stay with the platform and continue paying service fees.

    In December last year, a federal grand jury handed down a superseding indictment adding wire fraud to the list of charges pending against Sullivan for his role in the alleged attempted cover-up of the 2016 security breach at Uber. The incident led to around 57 million user and driver records being stolen.

    Continue reading
  • FabricScape: Microsoft warns of vuln in Service Fabric
    Not trying to spin this as a Linux security hole, surely?

    Microsoft is flagging up a security hole in its Service Fabric technology when using containerized Linux workloads, and urged customers to upgrade their clusters to the most recent release.

    The flaw is tracked as CVE-2022-30137, an elevation-of-privilege vulnerability in Microsoft's Service Fabric. An attacker would need read/write access to the cluster as well as the ability to execute code within a Linux container granted access to the Service Fabric runtime in order to wreak havoc.

    Through a compromised container, for instance, a miscreant could gain control of the resource's host Service Fabric node and potentially the entire cluster.

    Continue reading
  • US seeks exascale systems 10 times faster than current state-of-the-art computers
    China claims to have 10 in the pipeline and may pull ahead in HPC arms race

    The US Department of Energy is looking to vendors that will help build supercomputers up to 10 times faster than the recently inaugurated Frontier exascale system to come on stream between 2025 and 2030, and even more powerful systems than that for the 2030s.

    These details were disclosed in a request for information (RFI) issued by the DoE for computing hardware and software vendors, system integrators and others to "assist the DoE national laboratories (labs) to plan, design, commission, and acquire the next generation of supercomputing systems in the 2025 to 2030 time frame."

    Vendors have until the end of July to respond.

    Continue reading

Biting the hand that feeds IT © 1998–2022